I posted this to the FreeNAS subreddit and it was suggested that I submit this as a bug/feature enhancement. Thought I'd check here first.
What does this status message mean for my cloud sync task to B2?
https://imgur.com/a/f3LFFuT
Are these files comleted/total? Completed/outstanding? It doesn't seem to be a good representation of progress because the percentage climbed rapidly to around 75%, then both the numbers before and after the slash started increasing at nearly the same rate and the % complete slowed to a crawl. Note that after 4 hours, the percentage has not changed, but the numbers have increased. Strictly from the size of the B2 bucket on the other end vs total storage on this volume, I should be less than 50% complete. The volume is about 720GB and the bucket size is 336GB.
I'm running 11.2.
Thanks.
What does this status message mean for my cloud sync task to B2?
https://imgur.com/a/f3LFFuT
Are these files comleted/total? Completed/outstanding? It doesn't seem to be a good representation of progress because the percentage climbed rapidly to around 75%, then both the numbers before and after the slash started increasing at nearly the same rate and the % complete slowed to a crawl. Note that after 4 hours, the percentage has not changed, but the numbers have increased. Strictly from the size of the B2 bucket on the other end vs total storage on this volume, I should be less than 50% complete. The volume is about 720GB and the bucket size is 336GB.
I'm running 11.2.
Thanks.