winnielinnie
MVP
- Joined
- Oct 22, 2019
- Messages
- 3,641
In the release notes and upgrade instructions it reads:
Then, select the FreeNAS-11.3-STABLE train from the drop-down train menu.
No such option exists in my 11.2u7 system. Does it take some time before it makes visible the option to switch to the 11.3-STABLE train?
See screenshot below:
Then, select the FreeNAS-11.3-STABLE train from the drop-down train menu.
No such option exists in my 11.2u7 system. Does it take some time before it makes visible the option to switch to the 11.3-STABLE train?
See screenshot below:
Last edited: