Fabbat
Dabbler
- Joined
- Oct 24, 2013
- Messages
- 46
Hi guys,
I serach in the forum a possible answers to my problem but I think I didn't find (or I didn't catch) the process. I have Freenas 9.2, with a ZFS volume of 2 TB (1TB HDD+1TB HDD). My total amount of files is around 1.2 TB. I need to move all these files in a new HDD of 4TB to clean previous 1TB disks. I will drop one ( becouse it seems not fully ok) and I will use the last 1TB HDD to extend the 4TB volume to 5TB.
Is it possible? Can someone give me a description/list of main steps to do?
Thank you
I serach in the forum a possible answers to my problem but I think I didn't find (or I didn't catch) the process. I have Freenas 9.2, with a ZFS volume of 2 TB (1TB HDD+1TB HDD). My total amount of files is around 1.2 TB. I need to move all these files in a new HDD of 4TB to clean previous 1TB disks. I will drop one ( becouse it seems not fully ok) and I will use the last 1TB HDD to extend the 4TB volume to 5TB.
Is it possible? Can someone give me a description/list of main steps to do?
Thank you