Hello All,
Running FreeNAS 9.2.1.3
vol1 consists of 1 vdev with 3 3TB disks (da1, da2, da3) in a RAIDZ1 configuration with 1 50GB SSD drive (da4) for logs
I am planning on upgrading the 3 TB disks to 6TB disks. In reading the documentation (http://doc.freenas.org/9.3/freenas_storage.html?highlight=replace) I see the following steps for my use case:
1a) Backup data
1) In Volume Status set the 1st existing disk to be replaced as "offline"
2) Remove the 1st existing disk
3) Install the 1st upgrade disk
4) In Volume Status click "Replace" on the disk that has been removed and select the newly installed disk
5) Wait for the resilver to complete
6) Repeat until all disks have been replaced.
Am I missing anything?
~eric
Running FreeNAS 9.2.1.3
vol1 consists of 1 vdev with 3 3TB disks (da1, da2, da3) in a RAIDZ1 configuration with 1 50GB SSD drive (da4) for logs
I am planning on upgrading the 3 TB disks to 6TB disks. In reading the documentation (http://doc.freenas.org/9.3/freenas_storage.html?highlight=replace) I see the following steps for my use case:
1a) Backup data
1) In Volume Status set the 1st existing disk to be replaced as "offline"
2) Remove the 1st existing disk
3) Install the 1st upgrade disk
4) In Volume Status click "Replace" on the disk that has been removed and select the newly installed disk
5) Wait for the resilver to complete
6) Repeat until all disks have been replaced.
Am I missing anything?
~eric