Things I need the UPS to accomplish
#1 condition the power. in TN we have many brown outages and power spikes
#2 be able to shut down the NAS
#3 give our editors enough time to save and shut down their projects before the NAS shuts down (I was thinking 15 mins max.)
#4 Be as cheap as possible.
in transit now is a Supermicro SuperStorage SSG-6048R-E1CR60N with dual 8 core xeons.
between drives at the moment but leaning towards Seagate Exos 7E8.
this UPS will have to power a 60 drive supermicro machine so Im afraid how expensive it will be.
If anyone has any suggestions or ideas please let me know.
#1 condition the power. in TN we have many brown outages and power spikes
#2 be able to shut down the NAS
#3 give our editors enough time to save and shut down their projects before the NAS shuts down (I was thinking 15 mins max.)
#4 Be as cheap as possible.
in transit now is a Supermicro SuperStorage SSG-6048R-E1CR60N with dual 8 core xeons.
between drives at the moment but leaning towards Seagate Exos 7E8.
this UPS will have to power a 60 drive supermicro machine so Im afraid how expensive it will be.
If anyone has any suggestions or ideas please let me know.